An Ooma AirDial Sales Representative will be in touch shortly.
866-839-5810

Let’s talk and see how much you can save with Ooma AirDial.
We’ll follow up within a business day.
We’ll help you analyze whether Ooma AirDial is a good solution for your needs.
A custom quote will be generated.
Key Points:
It is a fair and reasonable question. If the lines are working, the systems connected to them are running, and no one has detected a problem, it can be hard to see why changing anything is urgent.
But here is the direct answer: POTS lines are going away. Major carriers are actively retiring legacy copper infrastructure, and the transition is already underway in many markets.
For organizations that still depend on POTS lines, the practical question is whether to migrate on a planned schedule, with time to evaluate requirements and coordinate contractors, or wait until rising costs, a service failure, or a carrier deadline forces the decision.
Here is a clear-eyed look at what continuing to rely on copper lines may mean over the next few years and what to do about it.
Many organizations have already experienced substantial increases in the cost of maintaining legacy copper lines.
The long-term economics are unlikely to become more favorable as carriers continue shifting investment toward fiber, wireless, and IP-based services.
Keeping existing POTS lines is not a permanent strategy. Carriers are actively retiring copper facilities and transitioning customers to newer network technologies.
Important distinction: A copper-retirement notice describes a change to the carrier’s network infrastructure. A separate service-discontinuance process may apply when the carrier plans to discontinue, reduce, or impair a regulated telecommunications service. Review any notice carefully to determine what is changing and which dates apply.
The transition may happen on your schedule or in response to a carrier deadline. Starting early gives you more time to understand your dependencies and select an appropriate replacement.
For organizations with fire alarm panels, elevator emergency phones, security dialers, or other critical equipment connected to copper lines, an unplanned service loss may create compliance consequences in addition to operational disruption.
These consequences do not necessarily mean the organization did anything wrong. They result from a critical system losing the communication path it needs to operate as intended.
A planned migration reduces the risk of discovering the problem during an inspection, outage, or emergency.
There is also a day-to-day reliability consideration.
AT&T has acknowledged that its aging copper network is increasingly difficult to support and is subject to frequent outages, including outages caused by copper theft.
One of the less visible consequences of staying on copper is the effect it can have on planning flexibility.
Organizations that plan the transition on their own schedule generally have more control over cost, installation timing, contractor coordination, and testing.
The benefit of moving proactively is not simply financial. It is the ability to complete the work carefully and verify that every connected system continues operating correctly.
If no retirement notice has arrived and everything is currently working, that is good news. It means you may have time to approach the transition methodically rather than under immediate deadline pressure.
Start by answering a few practical questions:
A POTS line replacement assessment can help answer these questions. It maps existing lines, identifies connected systems, surfaces hidden dependencies and costs, and provides a clearer picture of what a transition would involve.
AT&T has reiterated that it intends to stop providing service over the large majority of its domestic copper-based network by the end of 2029, while Verizon continues publishing location-specific copper-retirement notices.
Keeping your existing POTS lines may be possible for now, but it does not remove the need to plan for their eventual replacement. The good news is that organizations with an accurate inventory, the right technical documentation, and a clear migration plan can make the transition in manageable phases rather than responding to an emergency.